Pular para o conteúdo
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)

Price:

$ 45,80


EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)

https://gofinchkart.pt/web/image/product.template/146070/image_1920?unique=42ebd5c
8 sold in last 24 hours
  • NVIDIA GT610 GPU, 2GB DDR3 – Smooth Full HD Visuals: 2GB DDR3 frame buffer delivers reliable 1920×1080 Full HD display performance for video playback, office applications, web browsing, and everyday multimedia use.
  • VGA + HDMI + DVI Triple Output – Maximum Display Flexibility: Three simultaneous output ports connect to modern HDMI monitors, DVI displays, and legacy VGA projectors — covering virtually any display configuration.
  • Heat Sink + Fan – Effective Thermal Management: Integrated cooling solution ensures consistent GPU temperatures under sustained display workloads for reliable, long-term graphical output performance.
  • PCIe 2.0 Interface – Wide System Compatibility: PCIe 2.0 x16 support ensures seamless compatibility with both legacy and modern desktop motherboards without requiring PCIe 3.0 or newer slots.
  • Low Power Consumption, Premium Build – 3 Year Warranty: Energy-efficient design suits systems with modest power supplies. High-quality components for long-term durability. Backed by EVM's 3-Year warranty.

$ 45,80 45.8 USD $ 45,80

Not Available For Sale

($ 45,80 / Units)
8 people are viewing this right now

  • Fabricante
  • Número de unidades
  • Marca
  • UPC
  • Número de itens
  • Memory Clock Speed
  • Nome do modelo
  • Dispositivos Compatíveis
  • Coprocessador Gráfico
  • Número de embalagens
  • Número de parte de fabricante
  • País de origem
  • Número do modelo
  • Nome do Tipo de Item
  • Tipo de produto
  • Conteúdo da Caixa
  • Informações de Contato do Packer
  • Informação de Contacto do Importador
  • Unidade de Medida do Peso do Item
  • Informações de contato do fabricante
  • Localização da antena
  • Dimensões do Item L x W
  • Resolução máxima de visualização
  • GPU Clock Speed
  • Interface de Saída de Vídeo
  • Graphics Card Ram
  • Tipo de Ram Gráfico
  • Interface de Cartões Gráficos
  • Display Maximum Resolution
  • Number of Fans
  • Processador de Vídeo
  • Descrição dos Gráficos

Esta combinação não existe.

Graphics Cards Graphic Cards

Termos e Condições
Garantia de reembolso de 30 dias
Envio: 2-3 dias úteis

Estimated shipping
Select a product to estimate shipping.

The EVM GeForce GT610 is a compact and affordable graphics card designed to boost your older desktop PC's visual performance. It’s a reliable choice for everyday computing tasks and light gaming, offering a noticeable upgrade over integrated graphics.

Key Highlights

  • Full HD Display Support: Enjoy smooth 1920x1080 resolution visuals for video playback, web browsing, and general use.
  • Multiple Display Outputs: Connect to a variety of monitors with HDMI, DVI, and VGA ports.
  • Effective Cooling: The integrated heat sink and fan keep temperatures stable during extended use.
  • Broad Compatibility: Designed to work with PCIe 2.0 slots on most desktop motherboards.
  • Peace of Mind: Backed by a 3-year warranty for reliable performance.

Useful Facts

  • Graphics Processor: NVIDIA GeForce GT 730 4GB
  • Memory: 2GB DDR3 SDRAM
  • Clock Speed: 993 MHz (GPU) / 901 MHz (Memory)
  • Display Resolution: Up to 1920x1080 pixels
  • Interface: PCIe 2.0 x16

Good Fit For

  • Gaming (light titles and older games)
  • Office Productivity
  • Photo and Video Editing (basic tasks)
  • General Multimedia Use
  • Upgrading older desktop systems

Product details

EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
EVM GeForce GT610 Graphics Card GPU | 2GB DDR3 | PCIe 2.0 | HDMI VGA DVI | 1080p Full HD | Heat Sink Fan Cooling | Low Profile | Desktop Compatible | Stable Performance | 3 Year Warranty (EVM-GT610)
Main Specification
Fabricante EVM, Toll Free No: 180 010 20432 or Email us on [email protected]
Número de unidades 1.0 Contagem
Marca EVM
UPC 726684515264
Número de itens 1
Memory Clock Speed 901 MHz
Nome do modelo NVIDIA GEFORCE GT610 2GB GRAPHIC CARD
Dispositivos Compatíveis Área de trabalho
Coprocessador Gráfico NVIDIA GeForce GT 730 4GB
Product information
Número de embalagens 1
Technical Details
Número de parte de fabricante EVM-GT610
País de origem China
Item details
Número do modelo 2GB GT-610
Nome do Tipo de Item Graphic Cards
Others
Informações de Contato do Packer 1o andar or 391 or DIAMOND PLAZA BUILDING or Dr. D. B. MARG or LAMINGTON ROAD or MUMBAI-400004 INDIA or Hundia Infosolutions PVT LTD or 102
Localização da antena Jogos or Escritório or Professional or Photo & Video Editing
Interface de Saída de Vídeo HDMI or VGA or DVI
Tipo de produto Graphic Cards
Conteúdo da Caixa 1 Graphics Card
Informação de Contacto do Importador Toll Free No: 180 010 20432 or Email us on [email protected]
Unidade de Medida do Peso do Item 500 Grams
Informações de contato do fabricante Toll Free No: 180 010 20432 or Email us on [email protected]
Dimensões do Item L x W 20L x 15W Centimeters
Resolução máxima de visualização 1920x1080 Pixels
GPU Clock Speed 993 MHz
Graphics Card Ram 4 GB
Tipo de Ram Gráfico DDR3 SDRAM
Interface de Cartões Gráficos PCI-Express x16
Display Maximum Resolution 1920x1080 pixels
Number of Fans 1
Processador de Vídeo NVIDIA
Descrição dos Gráficos Nvidia GeForce GT610 2GB DDR3